The Problem

The airport was suffering from the continual breakdown and chipping of the arris edges of the concrete slab on the taxiway where they are jointed.  This was a continual problem due to the compressive forces of the aircraft nose wheels and the added problem of extreme weather cycle exposure.  Extensive areas needed repair and being one of the busiest airports in the world, the timescale was limited.

The Substrate

Concrete

repaired airport taxiway

The Solution

Trials using RESICHEM 570 Concrete Patch Repair XF were carried out in the summer and monitored throughout the winter. The surfaces were prepared with scabblers to leave a good edge prior to the application of RESICHEM 570 Concrete Patch Repair XF.

The areas for repair were only available for 7 hours throughout the night and all repairs had to be cured to a compressive strength of 20 N/mm. This was achieved by keeping the unmixed product warm prior to application and adding heat to the repaired areas to speed up the cure time. The repairs proved a complete success with the regular flow of aircrafts using the taxiway the following morning.

Products Used

Related Articles

Roof on WWTP Building

The Problem This WWTP was seeing extensive corrosion with their infrastructure. The corrosion was so advanced that it was causing

Bridge Protection

The Problem Weathered Steel also known as ASTM A-588, ASTM A-242, or Cor-Ten works well in many environments, and gives

Gutter Protection

The Problem The roof of this building of a worldwide supplier of automotive and building control systems, has two 177ft.

Gutter Repair & Waterproofing

The Problem This gutter had been cut all the way through and was leaking very badly. The customer needed a