Chiller Plant at Big 10 University – 2015

Chiller Plant at Big 10 University – 2015

The Problem

A Chiller Plant needed repair at a Big 10 University after experiencing galvanic corrosion, also know as bimetal corrosion, which was eating away at the metals and causing tubes to plug.  This University wanted to lower their energy cost and felt a hydrophobic ceramic enhanced polymer coating would provide a smoother surface and reduce energy bills.  They chose the USI Team to work on this important project. 

The Substrate

Metal

The Solution

For this chiller plant repair, the USI Team tented the area to create an exhaust/dust-free environment. Before blasting the tubes were corked to prevent abrasive blast media from going into the copper tubes.

The USI Team first abrasive blasted to NACE 2 specifications, to a 2 ½ to 4 mil anchor pattern then rebuilt lost metal around the tubes with RESIMETAL 201 Ceramic Repair Paste.

Lastly, two coats of RESIMETAL 203 Superflow Ceramic Repair Fluid were brush applied by the USI Team to give it a smooth, hydrophobic finish to be more efficient and provide an erosion and corrosion free environment. The first coat is applied in red, the second in gray. That way as you do your regular maintenance checks on your chiller, if you start to see red, you know it’s time to re-coat before you allow the galvanic corrosion to happen.

Products Used:

Speak with a technical expert at USI today:

Related Articles

Roof on WWTP Building

The Problem This WWTP was seeing extensive corrosion with their infrastructure. The corrosion was so advanced that it was causing

Bridge Protection

The Problem Weathered Steel also known as ASTM A-588, ASTM A-242, or Cor-Ten works well in many environments, and gives

Gutter Protection

The Problem The roof of this building of a worldwide supplier of automotive and building control systems, has two 177ft.

Gutter Repair & Waterproofing

The Problem This gutter had been cut all the way through and was leaking very badly. The customer needed a