PROBLEM

Inline Pump Rebuild: The veins on this vertical inline pump for a cooling tower at a refinery had severe abrasion wear because of the 30 years of service it provided.  The client wanted to see how the Resimac products could perform against the competition, and it came out with an exceptional review.

SUBSTRATE

Steel

PRODUCTS USED

SOLUTION

Unconventional Solutions came up with a 2 step process for this inline pump rebuild.

As you can see, the vein was 50% gone so the vein needed to be rebuilt with Resimac 201 Ceramic Repair Paste and Resimac 808 Reinforcement Mesh Tape.

After we rebuilt that piece, there were 6 other pieces of the pump that we coated with two coats of Resimetal 202 Ceramic Repair Fluid on the inside. This created a smoother surface for pump efficiency and provided abrasion resistance.

All the external pieces of the pump were coated with Resichem 501 CRSG in two colors.

With the 2-color system, when the pump goes back in service the client will be able to tell if the pump needs recoating because the gray layer will wear out showing the blue layer. If the client chooses this method of prevention, they will not need to rebuild the structure and will only need to put the top color coat on in the future.

If you are looking for a comprehensive inline pump rebuild and protection plan, reach out to the experts at Unconventional Solutions today.

This field is hidden when viewing the form

Next Steps: Sync an Email Add-On

To get the most out of your form, we suggest that you sync this form with an email add-on. To learn more about your email add-on options, visit the following page (https://www.gravityforms.com/the-8-best-email-plugins-for-wordpress-in-2020/). Important: Delete this tip before you publish the form.

Not sure what products best suit your project? Speak with a technical expert today!

Your Name(Required)
City and State
Your Email Address(Required)

Related Articles

Metal Frame Repair

The Problem A metal finishing company uses metal frames in the production of bands and superstructures for bridges and joists

Metal Roof Repair on WWTP Building

The Problem Metal roof repair: This WWTP was seeing extensive corrosion with their infrastructure. The corrosion was so advanced that

Bridge Protection

The Problem Weathered Steel also known as ASTM A-588, ASTM A-242, or Cor-Ten works well in many environments, and gives

Gutter Protection

The Problem The roof of this building of a worldwide supplier of automotive and building control systems, has two 177ft.

Gutter Repair & Waterproofing

The Problem This gutter had been cut all the way through and was leaking very badly. The customer needed a